Rehabilitation Of Lasbela Canal System & Feasibility Study For Development Of Hydropower Potential

Client Irrigation and Power Department, Government Of Balochistan
Location Balochistan.
Period Oct 2012 - June 2013

Our Services

  • Data Collection, Design Review and Condition Survey.
  • Survey and Investigations, Canal Design.
  • Structures Design and Hydrological Studies.
  • Feasibility Study for Hydropower Potential.
  • Tender Documents and Tender Drawings.
  • Cost Estimates and Specifications.
  • Tender Documents and Preparation of PC-1.

Project Overview

The proposed project area is located on the western part of District Lasbela covering an area of 74.30 sq. km. The Lasbela Canal was constructed in 1986. The command area surrounded by Lasbela Canal is about 22,000 acres. The canal also supply water for drinking purposed to inhabitants of the area through PHEDepartment.